Accountability Report
Cross-referencing CSJDM budget data, DPWH projects, and PhilGEPS contracts against what residents are actually experiencing on the ground. All findings are sourced and linkable.
Water Crisis: ₱2B Capex Promised, 1% Delivered
PrimeWater committed a ₱2 billion capital expenditure program under its joint venture with the city water district — but utilized only 1% of it. The deal was pre-terminated in April 2025 and officially ended in November 2025. Today, 47,611 households (≈250,000 residents, nearly a third of the city) still lack reliable piped water. As a stopgap, the city spends an estimated ₱370 million every year running 22 water tankers across all 62 barangays, 24/7. Meanwhile, the water district awarded ₱207.4M in water & utility contracts throughout PrimeWater's tenure.
Show related contracts (42)
Flooding Persists Despite ₱8.05B in Flood Projects
DPWH has funded ₱8.05B in flood control projects in CSJDM since 2016. On June 6, 2025, a single habagat event inundated 22 barangays — floodwaters rose neck-deep in Barangay San Rafael I within 45 minutes, overflowing a creek and damaging a bridge railing.
Show related projects (133)
₱733.9M in LDRRMF Collected — No Public Accounting
CSJDM has collected an estimated ₱733.9M in Local Disaster Risk Reduction and Management Funds (LDRRMF) from 2020–2025. RA 10121 mandates this be spent on disaster preparedness and mitigation. The city's Full Disclosure Policy page lists the required LDRRMF utilization report, but no COA-audited summary of how these funds were actually spent has been published publicly.
₱1.04B in Special Education Fund — No Public Spending Breakdown
CSJDM's budget data (via BLGF) shows an estimated ₱1.04B collected under the Special Education Fund (SEF) from 2020–2025. These figures reflect what the city reported as SEF income — not a direct accounting of how the fund was spent. By law, SEF must be used exclusively for public school operations and facilities in the city. However, no SEF utilization report has been published online by either the city government or SDO City of San Jose del Monte. Citizens currently have no way to verify whether the fund was spent on classrooms, teachers, or learning materials — or how much remains unspent.
Budget Surplus Every Year — But Basic Services Are Failing
CSJDM has posted a budget surplus every year from 2020–2025 (₱851.9M unspent in 2025 alone). If the city consistently underspends its budget, why are water supply and flood control — both funded for years — still failing residents? Underspending on capital projects while outsourcing services that fail is a pattern worth scrutinizing.
Sports Complex Delivered On Time
The San Jose del Monte Sports Complex (Contract 20CD0147, ₱14.1M) was completed in 2021 as contracted. At least one project was delivered as promised.
Show related contracts (1)
Data sources: BLGF LGU Fiscal Data, DPWH Infrastructure Dataset, PhilGEPS, NDRRMC/DROMIC incident reports, and news reports (Manila Times, Rappler, GMA News, The Watchers, Inquirer, PNA). Numbers are computed from live database records; narratives are sourced and linked above.
Findings last reviewed: . Budget and contract figures update automatically from live data. Narrative details (water crisis status, flood event dates, tanker cost estimates) reflect published reports as of that date — verify primary sources linked above for the latest developments.