Accountability Report

Cross-referencing CSJDM budget data, DPWH projects, and PhilGEPS contracts against what residents are actually experiencing on the ground. All findings are sourced and linkable.

2

Critical Issues

3

Warnings

1

OK

Water Crisis: ₱2B Capex Promised, 1% Delivered

PrimeWater committed a ₱2 billion capital expenditure program under its joint venture with the city water district — but utilized only 1% of it. The deal was pre-terminated in April 2025 and officially ended in November 2025. Today, 47,611 households (≈250,000 residents, nearly a third of the city) still lack reliable piped water. As a stopgap, the city spends an estimated ₱370 million every year running 22 water tankers across all 62 barangays, 24/7. Meanwhile, the water district awarded ₱207.4M in water & utility contracts throughout PrimeWater's tenure.

Show related contracts (42)

Flooding Persists Despite ₱8.05B in Flood Projects

DPWH has funded ₱8.05B in flood control projects in CSJDM since 2016. On June 6, 2025, a single habagat event inundated 22 barangays — floodwaters rose neck-deep in Barangay San Rafael I within 45 minutes, overflowing a creek and damaging a bridge railing.

Show related projects (133)
CONSTRUCTION OF RIVERWALL ALONG RIVER ESPLANADE SAN JOSE DEL MONTE CITY, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE BARANGAY MUZON DULONG BAYAN SAN JOSE DEL MONTE, BULACAN₱39.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER (BIGTE IPO DAM ROAD), SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACANCONTRACT LOCATION: SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN JOSE RIVER DULONG BAYAN AND MUZON, SAN JOSE DEL MONTE CITY, BULACAN₱32.6MREHABILITATION OF FLOOD CONTROL STRUCTURES ALONG SAN JOSE RIVER (MUZON SECTION), SAN JOSE DEL MONTE CITY, BULACAN₱27.9MREHABILITATION OF FLOOD CONTROL STRUCTURES ALONG SAN JOSE RIVER (TUNGKONG MANGGA SECTION), SAN JOSE DEL MONTE CITY, BULACAN₱28.7MCONSTRUCTION OF FLOOD CONTROL STRUCTURES SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱90.8MCONSTRUCTION OF FLOOD CONTROL STRUCTURES SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱46.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, STO.CRISTO RIVER,SAN JOSE DEL MONTE CITY LONE LD, BULACAN,STA. 0+497 - STA. 0+997₱46.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACANCONTRACT LOCATION: SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱90.8MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG KAYTUTONG BRIDGE, SAN JOSE DEL MONTE CITY, BULACAN₱49.0MCONSTRUCTION SLOPE PROTECTION, SAN MARTIN DE PORRES, SAN JOSE DEL MONTE CITY, BULACAN₱940,330CONSTRUCTION OF FLOOD CONTROL STRUCTURES ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱46.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD MITIGATION FACILITY ALONG SANTO CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO CRISTO RIVER (BIGTE IPO DAM ROAD), SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BAYAN RIVER (BIGTE IPO DAM ROAD), SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE DULONG BAYAN (PHASE III), CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE SAPANG PALAY PROPER, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE BARANGAY MINUYAN PROPER, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱94.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, SAN JOSE RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, GUMAOC, SAN JOSE DEL MONTE CITY, BULACAN₱33.9MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LINAWAN - DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN₱32.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, KAYBANBAN, SAN JOSE DEL MONTE CITY, BULACAN₱32.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN₱46.5MCONSTRUCTION OF SLOPE PROTECTION, TOWERVILLE, SAN JOSE DEL MONTE CITY, BULACAN₱33.9MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, POBLACION, SAN JOSE DEL MONTE CITY, BULACAN₱32.7MCONSTRUCTION OF SLOPE PROTECTION, MINUYAN V, SAN JOSE DEL MONTE CITY, BULACAN₱29.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE- IPO DAM ROAD SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱90.8MREHABILITATION OF DRAINAGE CANAL, GUMAOK CENTRAL, SAN JOSE DEL MONTE, BULACAN₱969,273CONSTRUCTION OF SLOPE PROTECTION, STO.NIÑO I, SAN JOSE DEL MONTE, BULACAN₱969,787CONSTRUCTION OF SLOPE PROTECTION, FATIMA V, SAN JOSE DEL MONTE, BULACAN₱969,945CONSTRUCTION OF SLOPE PROTECTION, MINUYAN III, SAN JOSE DEL MONTE, BULACAN₱969,945CONSTRUCTION OF SLOPE PROTECTION, SAN MARTIN DE PORRES, SAN JOSE DEL MONTE CITY, BULACAN₱9.3MRIPRAPPING OF CREEKBANK, BAGONG BUHAY I, SAN JOSE DEL MONTE, BULACAN₱27.9MRIPRAPPING OF CREEKBANK, POBLACION, SAN JOSE DEL MONTE CITY, BULACAN₱4.7MCONSTRUCTION SLOPE PROTECTION, MINUYAN V, SAN JOSE DEL MONTE CITY, BULACAN₱1.9MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, SAN JOSE RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN₱18.6MRIPRAPPING OF CREEKBANK, BAGONG BUHAY I, SAN JOSE DEL MONTE, BULACAN₱1.9MCONSTRUCTION OF SLOPE PROTECTION, BARANGAY POBLACION, SAN JOSE DEL MONTE, BULACAN₱18.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY LONE LD,BULACAN, STA. 1+984 - STA. 2+569 (DOWNSTREAM)₱46.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN₱93.6MCONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY CITRUS, SAN JOSE DEL MONTE CITY, BULACAN₱49.0MCONSTRUCTION OF SLOPE PROTECTION STRUCTURE, AREA C, SAN JOSE DEL MONTE CITY, BULACAN₱48.3MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION, SAN JOSE DEL MONTE CITY, BULACAN₱19.3MCONSTRUCTION OF SLOPE PROTECTION STRUCTURE, AREA G, SAN JOSE DEL MONTE CITY, BULACAN₱49.0MCONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF SLOPE PROTECTION STRUCTURE, AREA A, SAN JOSE DEL MONTE CITY, BULACAN₱49.0MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, PARADISE III, SAN JOSE DEL MONTE CITY, BULACAN₱31.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN₱27.3MCONSTRUCTION OF SLOPE PROTECTION, SAPANG PALAY PROPER, SAN JOSE DEL MONTE, BULACAN₱969,780CONSTRUCTION OF RIVERBANK PROTECTION, SANTO NIÑO I, SAN JOSE DEL MONTE CITY, BULACAN₱9.4MREHABILITATION OF DRAINAGE CANAL STA. CRUZ II, SAN JOSE DEL MONTE, BULACAN₱1.9MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱93.6MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GAYA-GAYA, SAN JOSE DEL MONTE CITY, BULACAN₱49.0MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TUNGKONG MANGGA, SAN JOSE DEL MONTE CITY, BULACAN₱29.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURE STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱94.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱94.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN₱44.1MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD SAN JOSE RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG KAYTUTONG BRIDGE, SAN JOSE DEL MONTE CITY, BULACAN₱30.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱90.7MCONSTRUCTION OF SLOPE PROTECTION, GRACEVILLE NATIONAL HIGH SCHOOL, SAN JOSE DEL MONTE, BULACAN₱969,763CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE- IPO DAM ROAD, SAN JOSE RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN₱78.3MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱46.5MCONSTRUCTION OF SLOPE PROTECTION, SAPANG PALAY RESETTLEMENT AREA, SAN JOSE DEL MONTE, BULACAN₱23.2MCONSTRUCTION OF FLOOD CONTROL STRUCTURES STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱46.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY LONE LD₱46.5MCONSTRUCTION OF DIKE ALONG SANTO CRISTO RIVER, BARANGAY KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF SLOPE PROTECTION, SAPANG PALAY PROPER, CITY OF SAN JOSE DEL MONTE, BULACAN₱92.7MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱94.6MCONSTRUCTION OF SLOPE PROTECTION, BRGY. SAN ROQUE, CITY OF SAN JOSE DEL MONTE, BULACAN₱39.2MCONSTRUCTION OF SLOPE PROTECTION BRGY. SAPANG PALAY RESETTLEMENT AREA, SAN JOSE DEL MONTE CITY, BULACAN₱9.3MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, PABAHAY 2000, BARANGAY MUZON, CITY OF SAN JOSE DEL MONTE, BULACAN₱52.6MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+300 STA.10+450, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, SANTO CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAPANG LAMIG, BARANGAY KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+000 STA.10+150, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+600 STA.10+750, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+150 STA.10+300, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARISSA 2, 4A, 4B AND 5A, BARANGAY KAYPIAN, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱93.6MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+450 STA.10+600, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+750 STA.10+900, CITY OF SAN JOSE DEL MONTE, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱93.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY FRANCISCO HOMES MULAWIN BARANGAY NARRA, SAN JOSE DEL MONTE CITY, BULACAN₱48.3MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINAGPANGGAHAN, BARANGAY PARADISE III, SAN JOSE DEL MONTE CITY, BULACAN₱68.9MCONSTRUCTION OF DIKE ALONG SANTO CRISTO RIVER, BARANGAY SANTO CRISTO, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF DIKE ALONG SANTO CRISTO RIVER, BARANGAY DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, TOWERVILLE, BARANGAY MINUYAN PROPER, SAN JOSE DEL MONTE CITY, BULACAN₱68.8MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY FRANCISCO HOMES GUIJO BARANGAY YAKAL, SAN JOSE DEL MONTE CITY, BULACAN₱48.3MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. BIGTE IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. BIGTE IPO DAM ROAD, SANTO CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. BIGTE IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF SLOPE PROTECTION, PANAKLAYAN, BRGY. GRACEVILLE TO BRGY. GAYA-GAYA, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱94.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAGONG BUHAY, CITY OF SAN JOSE DEL MONTE, BULACAN₱95.1MCONSTRUCTION OF SLOPE PROTECTION, HULO - KABAN, BRGY. KAYPIAN, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF SLOPE PROTECTION, PHASE 3B - CARISSA 3A, BRGY. KAYPIAN, CITY OF SAN JOSE DEL MONTE, BULACAN₱49.0MCONSTRUCTION OF DRAINAGE STRUCTURE, DIAMOND CREST, BRGY. SAN MANUEL, CITY OF SAN JOSE DEL MONTE, BULACAN₱29.4MCONSTRUCTION OF SLOPE PROTECTION, BRGY. KAYBANBAN, CITY OF SAN JOSE DEL MONTE, BULACAN₱38.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE IPO DAM ROAD, STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱94.1MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, NORTH DIAMOND, BRGY. MAHARLIKA, CITY OF SAN JOSE DEL MONTE, BULACAN₱38.6MCONSTRUCTION OF SLOPE PROTECTION, BRGY. GUMAOK EAST - CENTRAL, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF SLOPE PROTECTION, BRGY. FRANCISCO HOMES, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF SLOPE PROTECTION, BRGY. GUMAOC, CITY OF SAN JOSE DEL MONTE, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, ILOG BAYAN RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, STO. CRISTO RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN₱91.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD ILOG BAYAN RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN₱96.5MCONSTRUCTION OF RIPRAPPING, BRGY. STA. CRUZ I, SAN JOSE DEL MONTE CITY, BULACAN₱1.9MCONSTRUCTION OF SLOPE PROTECTION, BRGY. MUZON, SAN JOSE DEL MONTE CITY, BULACAN₱33.9MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.- BIGTE-IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱90.8MCONSTRUCTION/IMPROVEMENT/REHABILITATION OF SLOPE PROTECTION LEADING TO RELOCATION SITES, BRGY. BAGONG BUHAY, SAN PEDRO AND CITRUS, SAN JOSE DEL MONTE CITY, BULACAN₱9.3MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE- IPO DAM ROAD STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱68.6MCONSTRUCTION/REHABILITATION OF SLOPE PROTECTION, BRY. FRANCISCO HOMES - MULAWIN, SAN JOSE DEL MONTE CITY, BULACAN₱27.9MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, ILOG BAYAN RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN₱19.6MCONSTRUCTION OF SLOPE PROTECTION LEADING TO RELOCATION SITE BRGY. BAGONG BUHAY, SAN PEDRO AND CITRUS, SAN JOSE DEL MONTE CITY, BULACAN₱4.8MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, STO. CRISTO RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN₱19.6MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE- IPO DAM ROAD, STO. CRISTO RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN₱81.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE- IPO DAM ROAD, ILOG BAYAN RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN₱81.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE - IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱46.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE - IPO DAM ROAD, STO CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN₱46.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY LONE LD STA. 1+425 - STA. 2+010₱46.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY LONE LD₱46.4MCONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD, STO.CRISTO RIVER, SAN JOSE DEL MONTE CITY LONE LD₱46.5MCONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD STO. CRISTO RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN₱96.5M

₱733.9M in LDRRMF Collected — No Public Accounting

CSJDM has collected an estimated ₱733.9M in Local Disaster Risk Reduction and Management Funds (LDRRMF) from 2020–2025. RA 10121 mandates this be spent on disaster preparedness and mitigation. The city's Full Disclosure Policy page lists the required LDRRMF utilization report, but no COA-audited summary of how these funds were actually spent has been published publicly.

₱1.04B in Special Education Fund — No Public Spending Breakdown

CSJDM's budget data (via BLGF) shows an estimated ₱1.04B collected under the Special Education Fund (SEF) from 2020–2025. These figures reflect what the city reported as SEF income — not a direct accounting of how the fund was spent. By law, SEF must be used exclusively for public school operations and facilities in the city. However, no SEF utilization report has been published online by either the city government or SDO City of San Jose del Monte. Citizens currently have no way to verify whether the fund was spent on classrooms, teachers, or learning materials — or how much remains unspent.

Budget Surplus Every Year — But Basic Services Are Failing

CSJDM has posted a budget surplus every year from 2020–2025 (₱851.9M unspent in 2025 alone). If the city consistently underspends its budget, why are water supply and flood control — both funded for years — still failing residents? Underspending on capital projects while outsourcing services that fail is a pattern worth scrutinizing.

Sports Complex Delivered On Time

The San Jose del Monte Sports Complex (Contract 20CD0147, ₱14.1M) was completed in 2021 as contracted. At least one project was delivered as promised.

Show related contracts (1)
Key Numbers at a Glance
Residents without reliable piped water≈250,000 (47,611 households)
City's annual water tanker cost (stopgap)≈₱370,000,000
Barangays flooded — June 6, 202522
DPWH flood control budget (since 2016)₱8.05B
LDRRMF collected (2020–2025)₱733.9M
SEF collected (2020–2025, est.)₱1.04B
2025 budget surplus (unspent)₱851.9M
Water & utility contracts awarded₱207.4M

Data sources: BLGF LGU Fiscal Data, DPWH Infrastructure Dataset, PhilGEPS, NDRRMC/DROMIC incident reports, and news reports (Manila Times, Rappler, GMA News, The Watchers, Inquirer, PNA). Numbers are computed from live database records; narratives are sourced and linked above.